Request for Proposals # 2976793
... Expand
The right to conclude a contract for F21. "Development of methodological recommendations for determining the maximum possible fire load and methods of its placement in temporary storage facilities for various functional purposes of nuclear power plants and the implementation of production control."
Lot No.1 The right to conclude a contract for F21. "Development of methodological recommendations for determining the maximum possible fire load and methods of its placement in temporary storage facilities for various functional purposes of nuclear power plants and the implementation of production control." Collapse
| Archived | Tekhnologicheskii filial | 17.05.2022 09:00 |
Price monitoring request # 2557097
... Expand
Form 21. "Bilibino NPP. Analysis and substantiation of the fulfillment of the requirements of clause 3.1.8 and clause 4.1.9 of NP-001-15 by systems and elements important for safety, their functions within the scope of the NPP BIL project, taking into account the effects arising from accidents. " Collapse
| Archived | Tekhnologicheskii filial | 02.02.2021 23:59 |
Price monitoring request # 2552099
Form 21. Development of a Standard Program for Managing the Lifetime of NPP Buildings and Structures, taking into account the requirements of the newly introduced FNP.
| Archived | Tekhnologicheskii filial | 27.01.2021 23:59 |
Price monitoring request # 2552146
... Expand
Form 21. Implementation of technologies for repair and protection of NPP equipment using cold-curing polymer composite materials in terms of development and testing of the technology for repair and protection of circulating water pipelines by hot airless spraying using Belzon polymer composite materials (or analogues) from the effects of fresh (lake) water at Kalininskaya NUCLEAR PLANT. Collapse
| Archived | Tekhnologicheskii filial | 27.01.2021 23:59 |
Request for Proposals # 2529043
... Expand
The right to conclude an agreement for F21. "Preparation of conclusions based on the analysis of design, technical and substantiating documentation for the preparation for decommissioning of NPP units."
Lot No.1 The right to conclude an agreement for F21. "Preparation of conclusions based on the analysis of design, technical and substantiating documentation for the preparation for decommissioning of NPP units." Collapse
| Archived | Tekhnologicheskii filial | 30.12.2020 09:00 |
Price monitoring request # 2495581
... Expand
Form 21. "Bilibino NPP. Analysis and substantiation of the fulfillment of the requirements of clause 3.1.8 and clause 4.1.9 of NP-001-15 by systems and elements important for safety, their functions within the scope of the NPP BIL project, taking into account the impacts arising from accidents. " Collapse
| Archived | Tekhnologicheskii filial | 12.11.2020 23:59 |
Price monitoring request # 2487361
Form 21. "Actualization of initial data and verification of calculation results for the assessment of obligations for decommissioning NPP units."
| Archived | Tekhnologicheskii filial | 02.11.2020 23:59 |
Price monitoring request # 2487365
Form 21. "Revision of the Safety Guide for the Use of Atomic Energy" Requirements for the Content of the Decommissioning Program for a Nuclear Power Plant Unit "(RB-013-2000)"
| Archived | Tekhnologicheskii filial | 02.11.2020 23:59 |
Request for Proposals # 2445553
... Expand
The right to conclude an agreement for F21. "Development of the standard for Rosenergoatom Concern JSC" Assessment of the technical condition and residual life of the metal structures of the RBMK 1000 reactor "
Lot No.1 The right to conclude an agreement for F21. "Development of the standard for Rosenergoatom Concern JSC" Assessment of the technical condition and residual life of the metal structures of the RBMK 1000 reactor " Collapse
| Archived | Tekhnologicheskii filial | 11.09.2020 09:00 |
Request for Proposals # 2441896
... Expand
The right to conclude an agreement for F21. "Development of the standard for Rosenergoatom Concern JSC" Assessment of the technical condition and residual life of the channels of the control and protection system of the RBMK-1000 reactor "
Lot No.1 The right to conclude an agreement for F21. "Development of the standard for Rosenergoatom Concern JSC" Assessment of the technical condition and residual life of the channels of the control and protection system of the RBMK-1000 reactor " Collapse
| Archived | Tekhnologicheskii filial | 10.09.2020 09:00 |
Request for Proposals # 2439045
... Expand
The right to conclude an agreement for "Revision of documents on the operation of safety systems and systems important to safety:" 1.3.3.99.0036-2009. Diagnostics of the insulation of rotating machines of voltage classes from 0.4 kV to 24 kV by the characteristics of partial discharges. Methodical instructions "," 1.3.3.99.0037-2009. Diagnostics of electrical devices, switchgears of power plants and substations. Methodical instructions "," 1.3.3.99.0038-2009. Diagnostics of power transformers, autotransformers, shunt reactors and their inputs. Methodical instructions "," RD EO 1.1.2.25.0923-2013. Electrolysis plants for the production of hydrogen at nuclear power plants. Technical requirements"
Lot No.1 The right to conclude an agreement for "Revision of documents on the operation of safety systems and systems important to safety:" 1.3.3.99.0036-2009. Diagnostics of the insulation of rotating machines of voltage classes from 0.4 kV to 24 kV by the characteristics of partial discharges. Methodical instructions "," 1.3.3.99.0037-2009. Diagnostics of electrical devices, switchgears of power plants and substations. Methodical instructions "," 1.3.3.99.0038-2009. Diagnostics of power transformers, autotransformers, shunt reactors and their inputs. Methodical instructions "," RD EO 1.1.2.25.0923-2013. Electrolysis plants for the production of hydrogen at nuclear power plants. Technical requirements" Collapse
| Archived | Tekhnologicheskii filial | 07.09.2020 09:00 |
Price monitoring request # 2377545
F21. "Examination and maintenance of materials to substantiate the safe operation of building structures of buildings and structures of nuclear power plants aimed at the timely fulfillment of the requirements of the UL"
| Archived | Tekhnologicheskii filial | 08.06.2020 23:59 |
Price monitoring request # 2377619
... Expand
F21. "Implementation of repair and protection technologies for NPP equipment using polymer composite materials of cold curing in terms of development and testing of repair and protection technology for pipelines of the main RAB cooling water system by hot airless spraying using Belson’s polymer composite materials (or analogues) from the influence of sea water on LEN NPP-2. " Collapse
| Archived | Tekhnologicheskii filial | 08.06.2020 23:59 |
Request for Proposals # 1492026
... Expand
The right to enter into an Agreement for F21. "Updating the Programs for decommissioning of 1, 2 units according to the results of the examination of the Scientific and Research Center for Science and Technology of Nuclear and Radiation Safety" of a set of documents required to obtain a license for the operation of stopped 1, 2 units of the Beloyarsk NPP "
Lot No.1 The right to enter into an Agreement for F21. "Updating the Programs for decommissioning of 1, 2 units according to the results of the examination of the Scientific and Research Center for Science and Technology of Nuclear and Radiation Safety" of a set of documents required to obtain a license for the operation of stopped 1, 2 units of the Beloyarsk NPP " Collapse
| Archived | Tekhnologicheskii filial | 06.05.2020 09:00 |
Request for Proposals # 1473670
... Expand
The right to enter into an Agreement for F21. "Methodological and informational support for the preparation and conduct of integrated emergency response exercises at the Novovoronezh NPP"
Lot No.1 The right to enter into an Agreement for F21. "Methodological and informational support for the preparation and conduct of integrated emergency response exercises at the Novovoronezh NPP" Collapse
| Archived | Tekhnologicheskii filial | 27.03.2020 09:00 |
Request for Proposals # 1435866
... Expand
The right to enter into an Agreement for F21. "Feasibility study of the costs of preparing for decommissioning of power units of NPPs of Rosenergoatom Concern JSC in the period 2020-2035."
Lot No.1 The right to enter into an Agreement for F21. "Feasibility study of the costs of preparing for decommissioning of power units of NPPs of Rosenergoatom Concern JSC in the period 2020-2035." Collapse
| Archived | Tekhnologicheskii filial | 11.02.2020 09:00 |
Request for Proposals # 1430999
... Expand
The right to enter into an Agreement for F21. "Adjustment of the decommissioning program for power unit No. 1 of Kursk NPP"
Lot No.1 The right to enter into an Agreement for F21. "Adjustment of the decommissioning program for power unit No. 1 of Kursk NPP" Collapse
| Archived | Tekhnologicheskii filial | 05.02.2020 09:00 |
Price monitoring request # 1424564
... Expand
F21. Ensuring the safe operation of building structures on the topic: "Development of criteria / parameters for cleaning the irrigators of the BIG KLN NPP, PCT NPP, LEN NPP-2, NVO NPP-2 in order to ensure efficient and safe operation of tower evaporative cooling towers of NPPs." Collapse
| Archived | Tekhnologicheskii filial | 27.01.2020 23:59 |
Request for Proposals # 1416630
... Expand
The right to enter into an Agreement for F21. "Updating decommissioning programs for units No. 3 and No. 4 of the Kola NPP"
Lot No.1 The right to enter into an Agreement for F21. "Updating decommissioning programs for units No. 3 and No. 4 of the Kola NPP" Collapse
| Archived | Tekhnologicheskii filial | 22.01.2020 09:00 |
Price monitoring request # 1352099
F21. "Support of expert review of materials for PSE of power unit No. 2 of the Bilibino NPP in Rostekhnadzor. Interaction with experts of STC NRS ".
| Archived | Tekhnologicheskii filial | 08.10.2019 23:59 |