Request for Quotations # 152438
... Expand
Production of gears for the engines, according to the attached drawings.Production of standards, according to the attached drawings
Production of gears for the engines, according to the attached drawings. Production of standards, according to the attached drawings Collapse
| Archived | "Aviaremtsentr-Konversiia" OAO | 18.06.2012 14:45 |
Request for Proposals # 136755
... Expand
Partner services are required for the production cooperation for the manufacture according to the existing drawings: tool sets for the production of assembly units, titanium blank casting, non-ferrous metals, broaching cutters production, etc.
Always required: manufacture of tool sets for the production of assembly units: titanium and non-ferrous metal blank casting, grade: VT-5L, ML-5, 40KhNL, etc.; manufacture of spring metal products, air normals (compliant with GOST); tools production Collapse
| Archived | "Aviaremtsentr-Konversiia" OAO | 27.04.2012 11:02 |
Request for Proposals # 139590
Bearings: ShN-30 YuUT-30, 5-202 ETU 100/3.6-202 U, ETU 100/3.25-207 BT1, ETU 100/36-7211, ETU 100/4 and a number of others on a regular basis
We make the purchase of bearings on a regular basis. See procurement documentation.
| Archived | "Aviaremtsentr-Konversiia" OAO | 26.04.2012 11:17 |
Request for Proposals # 124367
... Expand
Spare parts required for the repair of aircraft engines, repair stock for aircraft engines and their aggregates
1. Capacitors: K52-7A 163750mkf... 2. Transistors P304... 3. Motor DID-0.5S4. Shock absorbers: for PO-500 for ZBN-1-15. Bearings 80089K (60089) for sensors D-1; 6. Trooper seats (1 set); 7. Rotor blades; 8. Fuel tanks; 9. Other Collapse
| Archived | "Aviaremtsentr-Konversiia" OAO | 02.03.2012 14:21 |
Request for Proposals # 125432
Group-repair kit for aircraft
Purchase of RGC 934, 935, 4017 group repair kits
| Archived | "Aviaremtsentr-Konversiia" OAO | 02.03.2012 00:55 |