Request for Proposals # 876871
centrifugal pump Grundfos CR 15-3 A-F-A-I-HQI, performance-16 m3/h, nominal pressure-34 m
motor power 3 kW, 3 x 380 v, with collapsible clutch to change mechanical seal, with impellers in stainless steel with flanged. -2 PCs.
| Archived | \"SOKOLINAIa GORA\" OOO | 28.09.2017 11:59 |
Request for Proposals # 892662
Selection security organization. ZK Sokolinaya Gora
| Archived | \"SOKOLINAIa GORA\" OOO | 27.09.2017 10:15 |
Request for Proposals # 884395
work package on air conditioning
| Archived | \"SOKOLINAIa GORA\" OOO | 12.09.2017 08:00 |
Request for Proposals # 884425
the device of floors
| Archived | \"SOKOLINAIa GORA\" OOO | 09.09.2017 10:00 |
Request for Proposals # 874786
... Expand
shop and Café (1 stage)
to perform work in accordance with the applicable regulations, in accordance with bound LLC "tvoy DOM" cipher project 39 TD/2016raboty accompanied by artwork acts on hidden certificate application to applied materials. renting work is done with styling Kit documentation. Collapse
| Archived | \"SOKOLINAIa GORA\" OOO | 28.08.2017 10:00 |
Request for Proposals # 875089
... Expand
set of works on the device of external setejk guest houses no. 18, 20W country estate "the Falcon of Horus.
, heating Water guesthouses No. 18, 20 is provided from existing networks, the output of the sewerage systems in existing and newly constructed wells. Collapse
| Archived | \"SOKOLINAIa GORA\" OOO | 25.08.2017 08:00 |
Request for Proposals # 875075
set of works for technical gas pipes perevooruzhenijudymovoj kotelnojv country estate "the Falcon of Horus.
| Archived | \"SOKOLINAIa GORA\" OOO | 24.08.2017 10:10 |
Request for Proposals # 874618
... Expand
installation of heating systems
1. The work of the preparatory period: develop a CPD, agree on projects with the customer. Temporary electrical supply to provide from the Customer point of construction sites storage. Delivery to the construction site materials, machines and mechanisms.
2. The primary period: installation of individual heat distribution punktaMontazh highways from ITP to the main risers with device teploizoljaciiBurenie holes hole ø and ø 100 mm. for the passage of pipes (if needed) Mounting the main risers, floor kollektorovRazvodka floor heating pipes, installation of heating priborovMontazh heating devices risers stair kletkahMontazh individual branches of heating of administrative and technical rooms of the first floor of the ITP with the connector above the floor and installation of heating devices. In technical rooms installation registers of smooth pipes. installation of the heating system automation systems installation views Collapse
| Archived | \"SOKOLINAIa GORA\" OOO | 22.08.2017 08:00 |
Request for Proposals # 873124
... Expand
installation of systems of water supply and drainage
in the value of the work must be included: costs-project development works (DDP)-preparation and signing of Executive documentation-temporary buildings and structures, including their delivery to the object; connection to power supply networks customer, payment of electricity per month (at the end of work-off); construction materials and other consumables required for the production of works; -tools and accessories required for manufacture of works;-machinery used in the production of works;-pay personnel performing work;-cleaning of solid waste and garbage generated in the production of works in the strictly reserved place, with subsequent disposal;-provision of workwear and personal protective equipment; -other costs associated with the implementation of the project. Collapse
| Archived | \"SOKOLINAIa GORA\" OOO | 21.08.2017 08:00 |