Request for Proposals # 3685516
Reinforcement of the walls of the 1st and 2nd floors in the axes 1-3/V-G ABC Block 6.
As part of the repair of the ABC building of Block 6, it became necessary to strengthen the walls.
| Current | "El 6 Chelyabins" | 10.06.2024 12:00 |
Request for Proposals # 3684639
Transfer of checkpoint-6
Repair of a built-in room measuring 7.4x3.28m in order to accommodate a checkpoint.
| Current | "El 6 Chelyabins" | 10.06.2024 10:00 |
Request for Proposals # 3684743
Installation of ITP, heat supply pipelines vent. ABC installations of Block 6.
Installation of control units of the vehicle, hot water, automation in the amount of 2 pcs, laying pipelines up to the vent. installations with mixing nodes.
| Current | "El 6 Chelyabins" | 10.06.2024 10:00 |
Request for Proposals # 3684766
Overhaul of water supply and sanitation systems
In connection with the overhaul of the ABC building of Block 6, it is necessary to repair water supply and sewerage.
| Current | "El 6 Chelyabins" | 10.06.2024 10:00 |
Request for Proposals # 3673367
Overhaul of the aspiration system of equipment 1,2 technological thread of the department of DRU unit No. 5 El 6 Chelyabinsk
restoration of efficiency and efficiency of dust collection from technological equipment
| Archived | "El 6 Chelyabins" | 31.05.2024 12:00 |
Request for Proposals # 3674196
Delivery of laboratory equipment according to the Requirements Specification.
Delivery of laboratory equipment according to the Requirements Specification. Payment is deferred for 45 calendar days.
| Archived | "El 6 Chelyabins" | 30.05.2024 14:00 |
Request for Proposals # 3667237
Overhaul of the facade of ABC Block 6
Due to the physical, it is necessary to carry out major repairs of the facade.
| Archived | "El 6 Chelyabins" | 27.05.2024 10:00 |
Request for Proposals # 3654279
Overhaul of the aspiration system of equipment 1,2 technological thread of the department of DRU unit No. 5 El 6 Chelyabinsk
restoration of efficiency and efficiency of dust collection from technological equipment
| Archived | "El 6 Chelyabins" | 17.05.2024 12:00 |
Request for Proposals # 3637755
Overhaul of water supply and sanitation systems
In connection with the overhaul of the ABC building of Block 6, it is necessary to repair water supply and sewerage.
| Archived | "El 6 Chelyabins" | 24.04.2024 12:00 |
Request for Proposals # 3639853
... Expand
installation of four pitch metering tanks in the mixing and pressing compartment of unit No. 5
The installation work is carried out according to:
1. Estimated calculation No. 699
2. Statement of work volumes no. SPO.11.
3. Assembly drawing. Collapse
| Archived | "El 6 Chelyabins" | 23.04.2024 12:00 |
Request for Proposals # 3638298
... Expand
Overhaul of the NS-1300 rotary vortex mill in the Mixing and pressing department of unit No. 5
The performance of major repairs is carried out according to:
1. Estimated calculation No. 713
2. Statement of work volumes No. SPO.60 DV2. Collapse
| Archived | "El 6 Chelyabins" | 22.04.2024 12:00 |
Request for Proposals # 3615608
... Expand
Development of a complete set of working documentation necessary for the installation and start-up of wet aspiration of the Mixing and pressing section of Block No. 5.
Perform the design in accordance with the NTD. As the main technical solution, use the project 004-2022 stage P, developed by DesignProektStroy LLC (Appendix No. 1 to this Requirements Specification) Collapse
| Archived | "El 6 Chelyabins" | 10.04.2024 12:00 |
Request for Proposals # 3619552
... Expand
installation of four pitch metering tanks in the mixing and pressing compartment of unit No. 5
The installation work is carried out according to:
1. Estimated calculation No. 699
2. Statement of work volumes no. SPO.11.
3. Assembly drawing. Collapse
| Archived | "El 6 Chelyabins" | 08.04.2024 09:00 |
Request for Proposals # 3605765
Installation of ITP, heat supply pipelines vent. ABC installations of Block 6.
Installation of control units of the vehicle, hot water, automation in the amount of 2 pcs, laying pipelines up to the vent. installations with mixing nodes.
| Archived | "El 6 Chelyabins" | 01.04.2024 12:00 |
Request for Proposals # 3610199
... Expand
LLC "El 6" (El 6 Chelyabinsk) announces an open request for proposals for the right to conclude a Contract for the
supply of two forklifts with a carrying capacity of 2,500 kg, according to the terms of reference
Delivery of two forklifts with a lifting capacity of 2,500 kg, according to the terms of reference Collapse
| Archived | "El 6 Chelyabins" | 29.03.2024 12:00 |
Request for Proposals # 3605531
... Expand
Development of a complete set of working documentation necessary for the installation and start-up of wet aspiration of the Mixing and pressing section of Block No. 5.
Perform the design in accordance with the NTD. As the main technical solution, use the project 004-2022 stage P, developed by DesignProektStroy LLC (Appendix No. 1 to this Requirements Specification) Collapse
| Archived | "El 6 Chelyabins" | 22.03.2024 12:00 |
Request for Proposals # 3601017
... Expand
Installation of general workshop ceiling lighting with a control device and 0.4 kV power supply, in the span "D-K" of the building of the machining department, Block No. 5
Project code 207-091 23-05,
Sections:
EO1 – to perform work on the installation of ceiling lighting with a control panel,
EM4 – to perform work on the supply of 0.4 kV power to the cabinets SCHR-1, SCHR-2, SCHR-3.
Installation of general workshop ceiling lighting with a control device and 0.4 kV power supply, in the span "D-K" of the building of the machining department, Block No. 5 Collapse
| Archived | "El 6 Chelyabins" | 21.03.2024 12:00 |
Request for Proposals # 3601062
... Expand
Installation of a structured cabling network in the built-in premises of the building of the mechanical processing department, Block No. 5
The work on the installation of a structured cabling system for connecting personal computers in the built-in premises, the work is carried out in accordance with this technical specification (Requirements Specification), working and estimated documentation:
Project code 207-091 23-05,
Section:
SCS – perform work on the installation of a structured cabling system.
Installation of a structured cabling network in the built-in premises of the building of the mechanical processing department, Block No. 5 Collapse
| Archived | "El 6 Chelyabins" | 21.03.2024 12:00 |
Request for Proposals # 3593864
... Expand
Complex of works on repair of built-in premises,
the buildings of the mechanical processing department, Block No. 5
AC2 – to carry out work on disassembly of structures and coatings specified in the documentation, installation of facades of premises, decoration of premises, filling of openings. The arrangement of the floors.
EO2 – to carry out work on the installation of the supply power grid, installation of lighting and outlet network in the built–in premises,
TH3 - to carry out the supply and arrangement of furniture, laboratory equipment.
OV3 – perform work on the installation of exhaust ventilation of the bathroom, installation of convectors of the electric heating system.
EM3 – perform work on the installation of the outlet network.
Complex of works on repair of built-in premises,
the buildings of the mechanical processing department, Block No. 5 Collapse
| Archived | "El 6 Chelyabins" | 15.03.2024 14:00 |
Request for Proposals # 3594408
... Expand
Modernization of PS control for radio control from the floor with the use of a frequency-controlled control system for de-registration in RTN.
Execution of the work:
Development and coordination of working documentation on the transfer of the PS to a remote control system via a radio channel and equipping with a frequency-controlled control system (replacement of the flexible current supply of the cargo trolley, transfer to radio control (Telecrane, push-button), installation of a gear motor for the movement of the crane bridge, Replacement of engines of the mechanisms of movement of the crane bridge, cargo trolley, etc. lifting, installation of frequency lift control systems, movement of the truck and the crane bridge, dismantling of the control cabin, manufacture and installation of an auxiliary cabin for access to the maintenance gallery)
Commissioning, testing and delivery of the PS.
Preparation of a package of documents for the removal of the PS from the register in Rostechnadzor.
Customer personnel training on operation, maintenance and troubleshooting.
Modernization of the bridge electric crane control system (transfer to ground-based radio control with dismantling of the crane operator's cabin). Collapse
| Archived | "El 6 Chelyabins" | 13.03.2024 12:00 |