Request for Proposals # 1377784
... Expand
Design and construction of the facility "Engineering networks of the pellet production workshop located at: Kirov region, the city of Murashi, st. Garage 10 "(sections PZ, EM, ES, EO, SS, ENS, NVK, OV, VK, TS)
Design and construction of the facility "Engineering networks of the pellet production workshop located at: Kirov region, the city of Murashi, st. Garage 10 "(sections PZ, EM, ES, EO, SS, ENS, NVK, OV, VK, TS) Collapse
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 15.11.2019 10:00 |
Request for Proposals # 1375333
... Expand
Design and construction of the premises of the line for cutting GPK plywood in the axes 41-42 / Ш-Ф "(sections KMD, AR)
Design and construction of the premises of the line for cutting GPK plywood in the axes 41-42 / Ш-Ф "(sections KMD, AR) Collapse
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 08.11.2019 12:10 |
Request for Proposals # 1377485
... Expand
Designing of facilities "Pellet production workshop. Production building No. 1 "and" Plant for the production of fuel pellets. Production building No. 2 "(sections of the PZ, POS, KZh, KM, KMD, AR, AS)
Designing of facilities "Pellet production workshop. Production building No. 1 "and" Plant for the production of fuel pellets. Production building No. 2 "(sections of the PZ, POS, KZh, KM, KMD, AR, AS) Collapse
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 07.11.2019 10:07 |
Request for Proposals # 1370927
... Expand
Design and construction of facilities "A pellet production workshop. Production building No. 1 "and" Workshop for the production of fuel pellets. Production building No. 2 "(sections of the PZ, POS, KZh, KM, KMD, AR, AS)
Design and construction of facilities "A pellet production workshop. Production building No. 1 "and" Workshop for the production of fuel pellets. Production building No. 2 "(sections of the PZ, POS, KZh, KM, KMD, AR, AS) Collapse
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 06.11.2019 13:41 |
Request for Proposals # 1349212
Rooms for hydraulic presses RUF No. 1,2,3,4
Rooms for hydraulic presses RUF No. 1,2,3,4
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 27.09.2019 16:00 |
Request for Proposals # 1341670
External power supply, wiring, and automation of the peeled veneer drying line VDJ-4-62-12 2-25 Sunway Machinery Co., Ltd
External power supply, wiring, and automation of the peeled veneer drying line VDJ-4-62-12 2-25 Sunway Machinery Co., Ltd
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 20.09.2019 09:27 |
Request for Proposals # 1330734
... Expand
Provision of services for providing three meals a day in the dining room of LLC Murashinsky Plywood Plant, located in the building of the Administrative building with cadastral number 43: 18: 310121: 292 at the address: Kirov region, Murashinsky district, the city of Murashi, st. Garage 10b
Provision of services for providing three meals a day in the dining room of LLC Murashinsky Plywood Plant Collapse
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 11.09.2019 10:00 |
Request for Proposals # 1331210
Installation of "Premises for heating a rolling table Equipment for supplying raw materials and waste disposal"
Installation of "Premises for heating a rolling table Equipment for supplying raw materials and waste disposal"
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 04.09.2019 10:13 |
Request for Proposals # 1323811
Installation of peeled veneer drying line VDJ-4-62-12 2-25 Sunway Machinery Co., Ltd
Installation of peeled veneer drying line VDJ-4-62-12 2-25 Sunway Machinery Co., Ltd
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 28.08.2019 10:12 |
Request for Proposals # 1314997
Foundation device SCHWABEDISSEN Maschinen GmbH
Foundation device SCHWABEDISSEN Maschinen GmbH
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 14.08.2019 10:28 |
Request for Proposals # 1314921
Laying foundation of a lamination press
The foundation of the lamination press
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 14.08.2019 10:27 |
Request for Proposals # 1314959
Fabrication and installation of the Rudnick und Enners Maschinen und Anlagenbau GmbH building
Fabrication and installation of the Rudnick und Enners Maschinen und Anlagenbau GmbH building
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 14.08.2019 10:00 |
Request for Proposals # 1286229
Installation of a resin ducting system for supplying adhesive composition to process equipment
Installation of a resin pipeline system for the supply of adhesive composition to the process equipment
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 04.07.2019 10:01 |
Request for Proposals # 1284103
Installation of Line for packing plywood number 2 with conveyors and lifting tables Lien Chien
Installation of Lines Chien package line No. 2 with conveyors and lifting tables
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 01.07.2019 14:33 |
Request for Proposals # 1246415
installation of the line of peeling, felling and stacking of the line 4ft. RauteSmart
installation of the line of peeling, felling and stacking of the line 4ft. RauteSmart
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 27.05.2019 10:00 |
Request for Quotations # 1238216
... Expand
Development of the system of technological data collection for the Line of peeling, felling and stacking of veneer 8 ft RauteSmart
Development of the system of technological data collection for the Line of peeling, felling and stacking of veneer 8 ft RauteSmart Collapse
| Archived | "MURAShINSKII FANERNYI ZAVOD" OOO | 08.05.2019 10:00 |