Request for Proposals # 937789
the device of concrete roads and sites, total area of 4544 m2.
the device a stone Foundation-715 M3 Device sandy grounds-233 M3, ferroconcrete canvas-1000 m3,
All the material the contractor.
| Archived | PMK \"SPP\" OAO | 25.12.2017 15:00 |
Request for Proposals # 937793
the construction of railway track length 347.78 m.p.
Styling crossing piece-1 k-t, movement paths to 0.4 m-73 m.p., dismantling concrete pavement-17 M3, vyesmka ground-1000 m3.
All the material the contractor.
| Archived | PMK \"SPP\" OAO | 25.12.2017 15:00 |
Request for Proposals # 882107
Device paved road length of 205 m, width 6 m (total area of asphalt surface of 2000 m2)
soil exploitation-1604.5 m3; Device Foundation-5161 M3; Device blacktop-2000 m2;
| Archived | PMK \"SPP\" OAO | 06.09.2017 15:00 |
Request for Proposals # 875114
... Expand
roof repair device of membrane roofing
-shaped sheet installation Disassembly at primykanijah (125.2 m.p.) Laying of plywood (107 sq.m.) Unit membrane roof underlay (889.4 sq.m.) Waterproofing membrane racks (37 places) Fabricate and install tray end cap (125.2 m.p.) All the material the contractor. Collapse
| Archived | PMK \"SPP\" OAO | 31.08.2017 09:00 |
Request for Proposals # 877212
Device paved road length of 205 m, width 6 m (total area of asphalt surface of 2000 m2)
soil exploitation-1604.5 m3; Device Foundation-5161 M3; Device blacktop-2000 m2;
| Archived | PMK \"SPP\" OAO | 30.08.2017 15:00 |
Request for Proposals # 877027
... Expand
the dismantling and subsequent installation of steel pipes
Dismantling steel pipeline salt drains Do 76-300 m. parosputnika Do 25-300 Dismantling dismantling of steam pipe insulation, m.p.-190 m2Montazh steel pipe salt drains Do 76-300 mp Installation parosputnika Do 25-300 mp all the material the contractor Collapse
| Archived | PMK \"SPP\" OAO | 29.08.2017 14:26 |
Request for Proposals # 875139
... Expand
the device system automatic watering the lawn
earthworks (ditches 0.3 m) with backfilling-1680 m.p. Laying pipes pipe mProkladka 40-180 32-480 mProkladka mUstanovka sedlovogo 25-1100 pipes-drainage 267 shtSborka and installation of irrigation equipment-267 shtSborka bystrorazemnogo installation and connection-40 shtUstanovka box with training places for installation-40 shtOpressovka and system commissioning rabotyVes material contractor. Collapse
| Archived | PMK \"SPP\" OAO | 28.08.2017 09:03 |
Request for Proposals # 875110
... Expand
roof repair device of membrane roofing
fabrication and installation of galvanized steel corner (194.4 m.p.) Disassembly/Assembly parapet caps (145 m.p.) Unit membrane roof underlay (735 sq.m.) Penoplex styling (50 m.) Dismantling-installation of water intake funnels (6 PCs.) Manufacture and installation of outflow with shtrobleniem (mp 44) The device of ventilating outlets diaphragm (18 places) All the material the contractor. Collapse
| Archived | PMK \"SPP\" OAO | 28.08.2017 08:00 |
Request for Proposals # 875088
... Expand
Device drainage system on the roof of the building, manufacturing and installation of ebb, replacing Prof.-sheet
installation of 520 m.p. gutter system with fittings. Manufacture and installation of tide-25 m.p. extra work during repair. Contractor Material Collapse
| Archived | PMK \"SPP\" OAO | 22.08.2017 15:00 |
Request for Proposals # 869466
the device reinforced concrete road length 990 m, a width of 6 m.
the device a stone Foundation-2292 M3 Device grounds of ASG-1489 m³, ferroconcrete cloths-1300 M3, the entire material of the contractor.
| Archived | PMK \"SPP\" OAO | 21.08.2017 15:00 |
Request for Proposals # 860757
work on landscaping
paving on glue-350 m2, the device of roll lawn-1060 m2, storm-well Device 1 PCs.
| Archived | PMK \"SPP\" OAO | 28.07.2017 16:10 |
Request for Proposals # 860684
work on installation of equipment elevator complex
installation of metal silos-112 tons, transport bridge, conveyors, gravity pipes, other elevator equipment
| Archived | PMK \"SPP\" OAO | 28.07.2017 15:01 |
Request for Proposals # 853989
fabrication and installation of tanks FAR 5000 M3
Should produce and mount the tank volume 2 5000 M3.
| Archived | PMK \"SPP\" OAO | 17.07.2017 15:31 |
Request for Proposals # 853999
Device zhelehobetonnyh designs
the device caps and bases under the P2 FAR tank 5000
| Archived | PMK \"SPP\" OAO | 17.07.2017 15:00 |