Public tender # 535
Lot #1. PGU-170 st. No. 12. 13 (overhaul)
Boiler unit BPG- 450:
1 main and auxiliary boiler equipment
2 heating surfaces of convective well
Turbines : K-145-130, GT-25-710:
3 turbine units
4 auxiliary turbine equipment
5 electrical equipme... Expand
Lot #1. PGU-170 st. No. 12. 13 (overhaul)
Boiler unit BPG- 450:
1 main and auxiliary boiler equipment
2 heating surfaces of convective well
Turbines : K-145-130, GT-25-710:
3 turbine units
4 auxiliary turbine equipment
5 electrical equipment
6 equipment of instrumentation with calibration
Power unit 160 MW st. No. 11 (mean-time repair)
Boiler TGM-94
7 main and auxiliary boiler equipment
8 heating surfaces of convective well, PBBP-54
Turbine K-160-130
9 turbine unit
10 auxiliary turbine equipment
11 electrical equipment
12 equipment of instrumentation with calibration
Power units 150 MW st. No. 6, 7, 8, 9, 10 (current repair)
Boiler TGM-94
13 main and auxiliary boiler equipment
14 heating surfaces of convective well, PBBP-54
Turbine K-150-130
15 turbine units
16 auxiliary turbine equipment
17 electrical equipment
18 equipment of instrumentation with calibration
19 Overhaul of transformers TDCG-200000/330 and TDC-80000/35
20 Overhaul of air switches 330 kV and 110 kV
21 Repair of electrical equipment of switchgear
22 Current repair of instrumentation subjected to state verification and calibration: KTC-1, GPP-1, 2, 2A, OBXBO, periphery objects
23 Repair of thermal insulation of equipment KTC-1, 2, TTC, chemical workshop, CCR
24 Repair of lining of equipment KTC-1, 2
25 Boiler cleaning works at equipment of KTC-1, 2, chemical workshop
26 Maintenance and repair of auxiliary equipment KTC-1
27 Maintenance and repair of auxiliary equipment KTC-2
28 Maintenance and repair of electrical workshop equipment
29 Maintenance and repair of equipment CCR
30 Maintenance and repair of equipment of chemical workshop
31 Maintenance and repair of equipment TTC
32 Maintenance of instrumentation : KTC-1, KTC-2, station equipment
33 Maintenance and repair of industrial conditioners, coolers and saturated water units of domestic product (excepting for mechanical part) Collapse
| Archived | "OGK-5" filial "Nevinnomysskaia GRES" OAO | 29.07.2004 09:00 |
Public tender # 14
Lot #1. Manufacturing and supply of convective lower pressure steam heater, outlet part for boiler TGM-94 No.6 with collectors at JSC "Nevinnomyssk SRPS" with separation to the lots:
Lot No.1:
Set of coils - 52 sets of 2 pcs. total weight-11,9 tons ... Expand
Lot #1. Manufacturing and supply of convective lower pressure steam heater, outlet part for boiler TGM-94 No.6 with collectors at JSC "Nevinnomyssk SRPS" with separation to the lots:
Lot No.1:
Set of coils - 52 sets of 2 pcs. total weight-11,9 tons
Set of coils - 52 sets of 2 pcs. total weight-11,73 tons
Set of coils - 52 sets of 2 pcs. total weight-11,65 tons
Set of coils - 52 sets of 2 pcs. total weight-11,4 tons
Total weight of sets is 46,68 tons
Lot No.2:
Inlet chamber - 1 pc., collector weight - 1,731 tons, collector length - 7,586 m.
Inlet chamber - 1 pc., collector weight - 1,731 tons, collector length - 7,586 m.
Outlet chamber - 1 pc., collector weight - 1,934 tons, collector length - 8,686 m.
Outlet chamber - 1 pc., collector weight - 1,934 tons, collector length - 8,686 m.
Total weight of collectors - 7,33 tons
Lot No.3:
Manufacturing of coils as per OST 108.030.40-79
Pipe elements of heating surface, connecting pipes within the boiler scopes, stationary collectors of steam boilers.
Coils made of pipe 42*4 as per TU 14-3P-55
Steel 12X1MF Steel 12X18H12T
Bend radii are 105 mm
Collector made of pipe 426*20 as per TU 14-3P-55
Steel 12X1MF
Fit-up of coil ends, fir-up of collector ends, arrangement of welded joints - in accordance with drawing.
Pole is in accordance with drawing. Collapse
| Archived | "OGK-5" filial "Nevinnomysskaia GRES" OAO | 14.10.2003 10:00 |
Public tender # 15
Lot #1. Supply of collectors for convective lower pressure steam heater, outlet part for boiler TGM-94 No. 8
at JSC "Nevinnomyssk SRPS":
Outlet chamber - 1 pc., collector total weight - 572 kg, collector total length - 2550 mm
Outlet chamber - 1 pc... Expand
Lot #1. Supply of collectors for convective lower pressure steam heater, outlet part for boiler TGM-94 No. 8
at JSC "Nevinnomyssk SRPS":
Outlet chamber - 1 pc., collector total weight - 572 kg, collector total length - 2550 mm
Outlet chamber - 1 pc., collector total weight - 532 kg, collector total length - 2350 mm
Outlet chamber - 1 pc., collector total weight - 532 kg, collector total length - 2350 mm
Outlet chamber - 1 pc., collector total weight - 620 kg, collector total length - 2686 mm
Outlet chamber - 1 pc., collector total weight - 620 kg, collector total length - 2686 mm
Outlet chamber - 1 pc., collector total weight - 572 kg, collector total length - 2550 mm
Outlet chamber - 1 pc., collector total weight - 206,2 kg, collector total length - 1040 mm
Total weight collectors is 3,86 tons
Collector made of pipe 426*20 as per TU 14-3P-55
Steel 12X1MF Collapse