Type: Request for Proposals
repair and construction works:
Single and cluster sleeper change, straightening of railway tracks in plan, profile, stacking of used sleepers on a permanent railway track (21st connecting track of the station Northern, the length of the repair section of the track is 3500 m).
both
Single and cluster sleeper changes, straightening of the railway track in plan, profile, stacking of used sleepers on a permanent railway track (25th connecting track of Dalnaya station, with a total length of 4580 m). Continuous change of the transfer bar on the switches No. 101,102,103,105 of the switch post No. 7.
Repair and construction works of railway tracks
ремонтно-строительные работы: Одиночная и кустовая смена шпал, выправка ж. д. пути в плане, профиле, штабелирование шпал б/у на постоянном ж. д. пути (21-й соединительный путь ст. Северная, протяженность ремонтного участка пути 3500 м). и Одиночная и кустовая смена шпал, выправка ж. д. пути в плане, профиле, штабелирование шпал б/у на постоянном ж. д. пути (25-й соединительный путь ст. Дальняя, общей протяженностью 4580 м). Сплошная смена переводного бруса на стрелочных переводах № 101,102,103,105 стрелочного поста №7. Ремонтно-строительные работы жд путей