Type: Request for Proposals
Complex of construction and installation works, with the production of drawings of KM, KJ, KMD
1. manufacture and installation
of a transition ladder from the service area of EF VP1
2. manufacture and installation of sites
for sampling the solid and gas phase of the air mixture from embedded
fittings in the flues after EF VP1
3. installation of a protective visor at the entrance
from the side of the railway to the pumping station GSHB 5.
4. Development of drawings of KM, KMD for the discharge pipe of clinker dust, sludge during cleaning from otm.+25.273 gallery SHPO between VP 1 and VP 2 to otm. +1.000
5. installation of a protective visor in front
of the entrance group of checkpoint No. 2 from the street
Complex of construction and installation works, with the production of drawings of KM, KJ, KMD
Комплекс строительно-монтажных работ, с изготовлением чертежей КМ, КЖ, КМД 1. изготовление и монтажа переходного трапа с площадки обслуживания ЭФ ВП1 2. изготовление и монтажа площадок для отбора проб твердой и газовой фазы воздушной смеси из врезанных штуцеров в газоходы после ЭФ ВП1 3. установка защитного козырька на въезде со стороны Ж/Д в насосную ГШБ 5. 4. Разработка чертежей КМ, КМД для трубы сброса клинкерной пыли, шлама при уборке с отм.+25.273 галереи ШПО между ВП 1 и ВП 2 до отм.+1.000 5. установка защитного козырька перед входной группой КПП№2 со стороны улицы Комплекс строительно-монтажных работ, с изготовлением чертежей КМ, КЖ, КМД